Philadelphia health inspection recordFood establishment · 19104
Rodriguez, Yibran / Calaveras Street Tacos / V01006
Non Permanent Location, Philadelphia, PA
Did they pass? Yes. Rodriguez, Yibran / Calaveras Street Tacos / V01006 passed its most recent Philadelphia health inspection on March 30, 2026.
- Inspections, last 12 months
- 1
- Passed
- 1
- Failed
- 0
- Visits with pests noted
- 0
- Facility type
- Food establishment
- Record ID
- e62ad67a-e7be-5ae9-5c7ff86f332b4507
- Last inspected
- March 30, 2026
The latest inspection, x-rayed
What the inspector found on March 30, 2026
Every inspection, newest first
-
March 30, 2026Passed
No violations listed for this visit.
From the Philadelphia Department of Public Health, Office of Food Protection, published as Philadelphia Department of Public Health, food inspection reports. Text is the inspector's, shortened only for length. Philadelphia does not give a grade or a pass or fail. Here, an inspection with no items cited counts as passed, and one with items cited counts as passed with conditions. Items 1 to 29 on the inspection form are the foodborne illness risk factors and are listed as serious. History builds up from mid November 2026 onward; earlier visits show only the latest one.
Questions
Did Rodriguez, Yibran / Calaveras Street Tacos / V01006 pass its health inspection?
Yes. Rodriguez, Yibran / Calaveras Street Tacos / V01006 passed its most recent Philadelphia health inspection on March 30, 2026.
How many times was Rodriguez, Yibran / Calaveras Street Tacos / V01006 inspected in the last year?
1 time in the last 12 months, with 0 failed results.
Who inspects Rodriguez, Yibran / Calaveras Street Tacos / V01006?
The Philadelphia Department of Public Health, Office of Food Protection. Philadelphia does not give a grade or a pass or fail. Here, an inspection with no items cited counts as passed, and one with items cited counts as passed with conditions. Items 1 to 29 on the inspection form are the foodborne illness risk factors and are listed as serious. History builds up from mid November 2026 onward; earlier visits show only the latest one.