DidTheyPass
Boston health inspection record
Food inspection recordBoston Inspectional Services Department

Retail Food · 02124

America's Food Basket

576 Washington St, Boston, MA

FailedOctober 29, 2026

Did they pass? No. America's Food Basket failed its most recent Boston health inspection on October 29, 2026.

Inspections, last 12 months
11
Passed
1
Failed
10
Visits with pests noted
3
Facility type
Retail Food
Record ID
74772
Last inspected
October 29, 2026
Data source
Analyze Boston, Food Establishment Inspections

The latest inspection, x-rayed

What the inspector found on October 29, 2026

Every inspection, newest first

  1. October 29, 2026Failed

    Failed, extra time given to fix · Inspection

    • Serious(a)-(p) person-in-charge-duties (pf) Plan review and engineer report required to auth prep in basement. Advised to stop any construction until approval is given. This should be done asap. Refer to email with all documentation attached to address this issue.
    • Floor and wall junctures coved and enclosed or sealed (c) Provide proper sealing on the basement floor for proper cleaning and sanitizing. Observed multiple holes and opening in ceiling and wall. Repair What this means
    • SeriousBackflow prevention (p) Observed a 3 bay sink utilized for food prep. Provide a quote via email from a licensed plumber on letter head for installation of an air gap. All work should be reviewed by isdhealth with a plan review and an engineering work. What this means
  2. October 15, 2026Failed

    Sent to a hearing · Inspection

    • Floor and wall junctures coved and enclosed or sealed (c) Provide proper sealing on the basement floor for proper cleaning and sanitizing. Observed multiple holes and opening in ceiling and wall. Repair What this means
    • SeriousBackflow prevention (p) Observed a 3 bay sink utilized for food prep. Provide a quote via email from a licensed plumber on letter head for installation of an air gap. All work should be reviewed by isdhealth with a plan review and an engineering work. What this means
    • Serious(a)-(p) person-in-charge-duties (pf) Plan review and engineer report required to auth prep in basement. Advised to stop any construction until approval is given. This should be done asap. Refer to email with all documentation attached to address this issue.
  3. October 5, 2026Failed

    Sent to a hearing · Inspection

    • Floor and wall junctures coved and enclosed or sealed (c) Provide proper sealing on the basement floor for proper cleaning and sanitizing. Observed multiple holes and opening in ceiling and wall. Repair What this means
    • Serious(a)-(p) person-in-charge-duties (pf) Plan review and engineer report required to auth prep in basement. Advised to stop any construction until approval is given. This should be done asap. Refer to email with all documentation attached to address this issue.
    • SeriousBackflow prevention (p) Observed a 3 bay sink utilized for food prep. Provide a quote via email from a licensed plumber on letter head for installation of an air gap. All work should be reviewed by isdhealth with a plan review and an engineering work. What this means
  4. July 24, 2026Passed

    Passed · Inspection

    No violations listed for this visit.

  5. July 21, 2026Failed

    Failed, extra time given to fix · Inspection

    • SeriousFood labels (pf) Observed ready to eat packaged sushi products without a use by date provided. PIC removed until proper labeling can be provided by vendor moji sushi.
    • Good repair and proper adjustment-equipment (c) Observed heavy ice build up on the exterior of the freezer unit in aisle 6. Repair and remove ice debri
  6. July 14, 2026Failed

    Failed · Inspection

    • SeriousFood labels (pf) Observed ready to eat packaged sushi products without a use by date provided. PIC removed until proper labeling can be provided by vendor moji sushi.
    • Good repair and proper adjustment-equipment (c) Observed heavy ice build up on the exterior of the freezer unit in aisle 6. Repair and remove ice debri
  7. March 20, 2026Failed

    Failed, extra time given to fix · Inspection

    • SeriousBackflow prevention (p) Observed a 3 bay sink utilized for food prep. Provide a quote via email from a licensed plumber on letter head for installation of an air gap. All work should be reviewed by isdhealth with a plan review and an engineering work. What this means
    • Floor and wall junctures coved and enclosed or sealed (c) Provide proper sealing on the basement floor for proper cleaning and sanitizing. Observed multiple holes and opening in ceiling and wall. Repair What this means
    • Serious(a)-(p) person-in-charge-duties (pf) Plan review and engineer report required to auth prep in basement. Advised to stop any construction until approval is given. This should be done asap. Refer to email with all documentation attached to address this issue.
  8. March 6, 2026Failed

    Failed, extra time given to fix · Inspection

    • Warewashing sinks and drain boards self-draining (c) Missing proper drain boards over the 3 bay sink utilized for prep. Provide PIC may install a prep sink. Advised to submit a plan review prior to installation for approval. What this means
    • Floor and wall junctures coved and enclosed or sealed (c) Provide proper sealing on the basement floor for proper cleaning and sanitizing. Observed multiple holes and opening in ceiling and wall. Repair What this means
    • SeriousBackflow prevention (p) Observed a 3 bay sink utilized for food prep. Provide a quote via email from a licensed plumber on letter head for installation of an air gap. What this means
    • Using drain plugs (c) Missing drain plugs. Provide plugs for all 3 bays. What this means
  9. February 5, 2026Failed

    Failed, extra time given to fix · Inspection

    • SeriousPestsControlling pests (pf) Observed a cat in the ceiling. Remove and provide a report from the company to confirm removal of live cat. PIC states the cat is trapped. What this means
  10. January 28, 2026Failed

    Sent to a hearing · Inspection

    • SeriousPestsControlling pests (pf) Observed a cat in the ceiling. Remove and provide a report from the company to confirm removal of live cat. PIC states the cat is trapped. What this means
  11. January 21, 2026Failed

    Failed · Inspection

    • SeriousUsing a handwashing sink-operation and maintenance (pf) Multiple handsinks observed with heavy food debris and cutting utensils stored. Remove and discontinue utilizing handsinks for any other purposes. What this means
    • Cleaning of plumbing fixtures (c) Multiple handsinks observed with food soils. Clean to remove What this means
    • SeriousPestsControlling pests (pf) Observed a cat in the ceiling. Remove and provide a report from the company to confirm removal of live cat. PIC states the cat is trapped. What this means

From the Boston Inspectional Services Department, published as Analyze Boston, Food Establishment Inspections. Text is the inspector's, shortened only for length. Boston marks each inspection Pass or Fail. A suspended permit, a hearing or a voluntary closure also counts as failed here. Violations marked with two or three stars are the serious ones.

Questions

Did America's Food Basket pass its health inspection?

No. America's Food Basket failed its most recent Boston health inspection on October 29, 2026.

How many times was America's Food Basket inspected in the last year?

11 times in the last 12 months, with 10 failed results and 3 visits where the inspector noted pests.

Who inspects America's Food Basket?

The Boston Inspectional Services Department. Boston marks each inspection Pass or Fail. A suspended permit, a hearing or a voluntary closure also counts as failed here. Violations marked with two or three stars are the serious ones.